Abu Dhabi Airport’s latest terminal, Terminal AÂ is set to open on November 1.
Transition Period: Nov 1 to Nov 14
From November 1 to 14, it will run in conjunction with Terminals 1, 2, and 3.
Official Inauguration: Oct 31
The official inauguration will be celebrated with an Etihad ceremonial flight on October 31.
Exclusive Operations: From Nov 15
Starting November 15, all airlines will exclusively operate from Terminal A.
Readiness for Passenger Arrival: Terminal A
Abu Dhabi Airports has assured that all major services and facilities are prepared to welcome the terminal’s first passengers.
Awareness Campaign: Terminal A
An awareness campaign has been initiated to guide passengers and visitors to the correct terminal.
Check Terminal Information: Terminal A
Travellers scheduled to fly from Abu Dhabi between November 1 and 14 have been encouraged to check their terminal information on the airport’s website.
Digital Navigation Assistance
The new terminal’s exact location has been added to popular navigation apps like Google Maps and Waze.
Efficient Access
For those driving, it is easily accessible via highways E10 and E11, with clear signage.
Smooth Passenger Drop-offs
Passengers using taxis or public transportation can be dropped off directly at the terminal.
Increased Capacity
Frank McCrorie, Chief Operating Officer at Abu Dhabi Airports, highlighted the significant increase in capacity that the new terminal will bring.
Flight Information
He urged passengers traveling in November to check the airport’s website or contact their airline for the most up-to-date flight information.
Inter-Terminal Shuttle Buses
The airport operator has also introduced inter-terminal shuttle buses for passengers who need to move swiftly between terminals.
Also Read